Improving the methodology of main power equipment choice for the gas turbine plants

Authors

  • Evgeny Lisin
  • Wadim Strielkowski
  • Ivan Komarov
  • Ivan Garanin

DOI:

https://doi.org/10.7251/ELS1519080L

Abstract

Our paper considers the problem of economic substantiation of the choice of the main power equipment at the stage of functional studies of investment projects in conditions of uncertainty and incompleteness of initial data. As a solution to the designated problem we suggest using the method of the best equipment for gas turbine power plant choice. The method is based on an optimality criterion of power equipment choice which allows us to determine the best solution for the gas turbine from the perspective of capital and operating costs minimizing.

Published

2016-07-15