PROBLEMS OF HERMETICALITY OF WELLS FOR LEACHING IN “TETIMA” MASSIF AND REPAIRING CONSTRUCTION IN CASE OF UNHERMETICAL COLUMN PIPES 9 5/8"

Authors

  • Almir Šabović
  • Sanel Nuhanović
  • Adnan Hodžić
  • Adnan Nalić

DOI:

https://doi.org/10.7251/afts.2014.0610.073S

Abstract

As it is known, the extraction of rock salt from deposit “Tetima”, Majevica, performed is by controlled
leaching in the underground chambers positioned diply in the salt deposit. The connection between the
underground chamber, that represents the basic production unit in the primary salt production and
technological installations on the surface, is through a deep wellbore, which is an integral part of the
leaching system.

Published

2014-06-01