USE OF BROMS’S METHOD AND FINITE DIFFERENCE METHOD IN THE DIMENSIONING OF PILES FOR FOUNDATION PIT INSURANCE
DOI:
https://doi.org/10.7251/afts.2014.0611.065VAbstract
Implementation of major construction projects thanks are due to the technological development of materials and equipment to perform. Development of equipment for piles, allowed this type of structure a large application, as in the system of basic structural elements, as well as providing (temporary or permanent) construction site. Influences on the pile construction, since the purpose is very different. In the case that they are intended to ensure the construction work area, the dominant influence of lateral pressure or horizontal load. Just such an example will be processed in this paper with a tendency to show the dependence of the results on the choice of calculation methods of calculation.