REASONS TO CHANGE THE TENDER PROJECT OF A TUNNEL DURING CONSTRUCTION
DOI:
https://doi.org/10.7251/afts.2015.0713.043LAbstract
During construction, especially of tunnels, very often there is a need to change the tender technical
documents, i.e. the documents upon which the construction permit is obtained and the tender is
announced. The main reason for the change of documentation is, above all, unsuficient geotechnical
investigations due to which technical solutions and calculations are inadequate. Very rearly
documentation is changed due to errors in the calculation if the techncal review of documentation is
correctly done. The paper presents an example of the change of documentation during construction and
the reasons for that.